Skip to content
Wood Fence Installation in Lenexa, KS — The Modern Horizontal Look, Framed to Last

Wood Fence Installation in Lenexa, KS — The Modern Horizontal Look, Framed to Last

Lenexa asks for the clean horizontal cedar line more than any city in the metro — and that look lives or dies on a dead-true post line. We frame it right, and we set the posts deep enough to hold it against the west-side wind.RKC Wood Care Pros installs horizontal cedar slat, vertical cedar privacy, pressure-treated pine, and composite from $20 to $60 a linear foot — posts set 36 inches deep in concrete against the wind and freeze-thaw west of I-435, drainage read on the fast-graded new-construction lots, and the first stain coat brushed in-house before Lenexa cedar grays. 4.9 stars across 85 Google reviews, 400-plus fences around the metro since 2021.

★★★★★
4.9
from 85 reviews
Licensed
& Insured · KS + MO
400+
fences installed
A+ BBB Rated 400+ Fences Installed Since 2021 In-House Stain Crew Free On-Site Estimates
Browse wood options ↓

WHY LENEXA HOMEOWNERS CHOOSE WOOD

The Horizontal "Lenexa Look" — and the Post Line That Holds It Straight

1

The modern horizontal look Lenexa asks for more than anywhere

Around City Center and the newer master-planned pockets, the fence homeowners point to isn't a wall of vertical pickets — it's a clean horizontal cedar slat run, often on black-framed posts. Lenexa asks for that contemporary look more than any other city we build in. A horizontal board spans differently than a vertical one, so we run dead-straight posts and tension the boards so the line reads sharp instead of wavy — the whole point of the style is the crisp line, and that's a build decision, not a lumber choice.

2

A footing that won't rock loose in the open west end

West of I-435 the subdivisions are newer and the lots more exposed, so a run out there takes more wind than the sheltered east ever sees. A post set shallow starts to rock in its hole, and once water gets into that gap, freeze-thaw finishes the job and the top drifts off plumb. Our answer is three feet of depth locked in poured concrete — no play at the base, so a tall panel toward the K-10 corridor stays put instead of leaning section by section.

3

Drainage on the fast-built new-construction lots

Lenexa's rapid development is a double edge: beautiful new neighborhoods, but a lot of yards get graded for the house and not the water, and some sit next to the on-site detention ponds common in these developments. Standing water at a post base is what rots a fence early. We read the grade before we dig, bed each footing on gravel so water moves away from the wood, and deepen that bed on the low, poorly-drained runs — the fix for the premature rot we see on the newer builds.

4

1980s cedar aging out — and an in-house stain crew to keep the new one

A lot of Lenexa is 1980s ranch stock, and the original cedar on those homes is timing out all at once — it's a big share of what we tear down and replace here. Whatever style goes up next, horizontal or vertical, bare cedar grays fast under a Kansas sun once the coat lapses. So we keep the staining in-house, log the finish date, and come back on the two-year cycle instead of handing you to someone else. A clean horizontal line especially depends on that even, kept-up finish. 4.9 stars across 85 Google reviews.

THE POST LINE IS THE PRODUCT

Why a Lenexa Post Line Reads Straight and Stands Against the West-Side Wind

Where What we build there What it does in Lenexa
The post line itself Dead-true posts set plumb and in-line, footings poured to hold them there A horizontal slat run reading wavy — the modern Lenexa look lives or dies on a straight post line
0 – 36 inches The post locked in a full concrete collar, not tamped dirt The wind working a run loose on the open, still-building ground west of I-435 toward K-10
36 inches (frost line) Every footing carried down to the full three feet The winter heave that lifts a short post — Kansas ground freezes and thaws dozens of times each season
At the groundline A gravel drainage bed under the footing, deepened on low-lying lots The standing water on fast-graded new-construction yards and detention-pond-adjacent runs that rots a post base early

On a horizontal run the post line isn't hidden behind pickets — it is the fence, so every footing has to hold plumb and true, and out west it has to do that against the wind. Depth in concrete, drainage on the new-build lots, and a strung, tensioned line are what carry it. For the full run of species, grades, and the 36-inch standard across the metro, see our Kansas City wood fence installation page; this is the version built for Lenexa's modern look and its west-side ground.

PICK YOUR BUILD

Horizontal Slat, Vertical Privacy, Composite & Pine — for the Lenexa Yard

Horizontal Cedar Slat by RKC Wood Care Pros in Lenexa, KS

Horizontal Cedar Slat

The Lenexa Look · modern line

Cedar boards run the long way instead of up-and-down, often on black steel-framed posts — the contemporary look Lenexa asks for more than any city in the metro. It's a build, not just a style: the boards span between posts, so a true post line and proper board tension are what keep it crisp instead of sagging. We frame it to read sharp from the street, the way City Center homeowners want it.

  • Price: $30–42/LF installed
  • Lifespan: 15–25 years
  • Maintenance: Re-stain every 2 years
Vertical Cedar Privacy by RKC Wood Care Pros in Lenexa, KS

Vertical Cedar Privacy

The volume run · full screening

Six-foot dog-ear or board-on-board — still the standard behind the 1980s ranches across Lenexa, and the fence most often replacing the tired original cedar in those neighborhoods. Cedar's own oils fight rot without chemicals and the grain takes stain evenly. Where the horizontal look is about the line, this is about full, no-gap privacy for a backyard.

  • Price: $25–35/LF installed
  • Lifespan: 15–25 years
  • Maintenance: Re-stain every 2 years
Composite (Trex / TimberTech) by RKC Wood Care Pros in Lenexa, KS

Composite (Trex / TimberTech)

No stain, ever · high near City Center

Recycled wood-polymer boards that pass for stained cedar and never take a brush — available in horizontal too. The up-front number is the highest of the four, but Lenexa has more low-maintenance buyers than most metro cities, and on a long hold the skipped two-year stain call is where composite earns back. Manufacturer-warrantied for 25 years.

  • Price: $42–60/LF installed
  • Lifespan: 25–30 years
  • Maintenance: No staining — soap-and-water rinse
Pressure-Treated Pine by RKC Wood Care Pros in Lenexa, KS

Pressure-Treated Pine

The budget line

Southern yellow pine, kiln-dried and treated so rot and insects leave it alone — the choice when the number drives the decision. It earns its place on a side yard, a back stretch, or anywhere the neighbors aren't judging the grain. One catch: the treatment chemistry needs roughly 90 days to cure before stain will soak in rather than bead off, so the first coat waits.

  • Price: $20–28/LF installed
  • Lifespan: 10–15 years
  • Maintenance: Re-stain every 3 years (first coat at 90 days)

MATCHING THE BUILD TO THE LOT

Horizontal, Vertical, Composite, or Pine — What Fits the Lenexa Yard

Build Installed Lifespan Stain cycle Best for
Horizontal Cedar Slat $30–42 / LF 15–25 yrs Recoat every 2 yrs · first at 30 days The signature Lenexa Look — City Center and the modern master-planned neighborhoods where the clean horizontal line is the ask
Vertical Cedar Privacy $25–35 / LF 15–25 yrs Recoat every 2 yrs · first at 30 days Full six-foot screening — the volume run in the 1980s ranch neighborhoods trading out tired original cedar
Composite (Trex / TimberTech) $42–60 / LF 25–30 yrs None — just a soap-and-water rinse The low-maintenance owner Lenexa has a lot of — wants the modern look and no stain call, common near City Center
Pressure-Treated Pine $20–28 / LF 10–15 yrs Recoat every 3 yrs · first at 90 days The budget line for a side yard or back run where the number matters more than the material

Horizontal cedar is the look Lenexa reaches for near City Center and the modern subdivisions; vertical cedar is the volume screening run behind the 1980s ranches. Composite suits the low-maintenance owner Lenexa has plenty of, and pine holds the budget line on runs nobody sees. Tell us the look you're after and how long you're staying, and we'll put numbers on the two you're weighing.

Cedar fence cost guide — Lenexa, KS — RKC Wood Care Pros

LENEXA WOOD FENCE PRICING

What Wood Fence Installation Costs in Lenexa

Horizontal Cedar Slat — 6 ft

$30–42

per linear foot installed

The Lenexa Look. The extra over vertical is the framing and layout the modern line takes.

Vertical Cedar Privacy — 6 ft

$25–35

per linear foot installed

Board-on-board or dog-ear. The volume run in the 1980s ranch neighborhoods.

Pressure-Treated Pine — 6 ft

$20–28

per linear foot installed

15–20% under cedar. The budget pick for side and back runs.

Composite runs $42–60 per linear foot with no stain schedule. The framing a horizontal run takes, wide gates, heavy drainage work on a low new-construction lot, and old-fence tear-out are each their own line on every Lenexa estimate — call (913) 286-1091 or set up an on-site walkthrough.

FROM ESTIMATE TO FINAL COAT

A Lenexa Wood Fence Install, Step by Step

1

On-site estimate and property walkthrough

We come out and read the lot — whether you're after the horizontal modern line or full vertical screening, how exposed the run is to the wind west of I-435, and how the yard drains, since a lot of the newer Lenexa builds shed water toward the fence instead of away. If a tired 1980s fence is coming out, we check it too. What comes back is a written, itemized price: footage, style, cedar or pine or composite, gates, concrete, tear-out, and the first stain coat.

2

Layout, post-line plan, and utility locates

For a horizontal run this step matters more than any other — the whole look depends on a dead-true post line, so we string it, plumb every post location, and plan the board coursing before anything goes in the ground. We call the 811 locate and stage the cedar to acclimate. On the low, fast-graded new-construction lots we plan the drainage here, because where the water goes decides where the footings get a deeper gravel bed.

3

Install — posts 36 inches deep, framed true for the line

Each post goes three feet down into poured concrete — the depth that keeps a run true against the west-end wind and the winter heave — sitting on a gravel bed that gets deepened wherever the lot drains poorly. For a horizontal build we pull a tensioned string and set every post to it, then hang the boards on framing sized to carry the span without cupping. Fasteners are ring-shank galvanized nails and stainless screws, chosen because they hold their grip instead of working loose as the fence flexes.

4

First stain coat — in-house, before the fade

Left bare, a fresh Lenexa cedar fence starts graying within a season — and on a horizontal run that fade is more obvious, because the eye tracks straight down the line and catches any unevenness. Fresh cedar wants about a month to dry down before it will take stain; treated pine needs closer to 90 days for its chemistry to settle. Once it's ready, our own crew brushes on a penetrating semi-transparent coat and books the two-year recoat so the color never gets away from you.

RECENT LENEXA WOOD INSTALLS

Residential cedar board fence in Lenexa, KS by RKC Wood Care Pros
Cedar Board Fence · Lenexa
Semi-transparent stained cedar shadowbox fence in Lenexa, KS by RKC Wood Care Pros
Stained Shadowbox · Lenexa
Honey-stained cedar picket fence in Lenexa, KS by RKC Wood Care Pros
Honey-Stained Cedar · Lenexa
Cedar fence stain before-and-after in Lenexa, KS by RKC Wood Care Pros
Re-Stain Before/After · Lenexa

REVIEWS

What Kansas City Homeowners Say About RKC

4.9 ★ · 85 Google reviews

Every review is on our Google Business Profile — read them there, unedited.

Read all 85 reviews on Google

LENEXA WOOD FENCE QUESTIONS

Wood Fence Installation Questions Lenexa Homeowners Ask Most

Cedar fence dark walnut re-stain in Lenexa, KS by RKC Wood Care Pros

Wood Materials & Lifespan

Can you build the modern horizontal cedar look I keep seeing in Lenexa?
Yes — it's one of the most-requested builds we do in Lenexa, especially around City Center and the newer master-planned neighborhoods. The key thing to understand is that horizontal is a construction difference, not just a lumber swap: the boards run the long way and span between posts, so the whole look depends on a dead-true, plumb post line and properly tensioned boards. Set it loose and the line goes wavy and the boards cup. We frame it on straight posts, often black steel-framed, so it reads sharp from the street the way the style is supposed to.
Does a horizontal fence sag or hold up as well as a vertical one?
It holds up just as well when it's built for the span, which is the whole game with horizontal. A vertical picket is short and can't sag; a horizontal board runs the full distance between posts, so it needs a true post line, correct board thickness, and framing that supports the span. Built right, it lasts the same 15 to 25 years a vertical cedar fence does. Built by someone treating it like a vertical fence turned sideways, it cups and waves within a couple of seasons. The difference is entirely in the framing.
Why do fences west of I-435 seem to lean over time?
It's a chain reaction that starts at a too-shallow footing. Out toward K-10 the newer subdivisions sit on open ground that takes real wind, and every gust nudges the panel; if the post wasn't set deep, that nudge rocks it a hair, water seeps into the gap, and the next freeze widens things a little more. Repeat over a few winters and the run tips out of plumb one bay at a time. Drop the post a full three feet into concrete and the base has no give to start the chain — which is also why a horizontal line stays dead-straight out there.
How long does a cedar fence last in Lenexa?
Plan on fifteen to twenty-five years, and where you land in that window comes down to three things we control on install day. First, how deep the posts sit — a genuine 36 inches in concrete so neither the west-end wind nor the winter heave can move them. Second, whether water drains away from the footings, which is why the gravel bed goes deeper on the low new-build lots. Third, the finish — recoated every two years before the gray sets in. Get all three right and clearing twenty years is routine here.

Pricing & Stain Schedule

What does a wood fence cost in Lenexa?
The signature horizontal cedar slat runs $30 to $42 a linear foot installed; go vertical cedar privacy and it's $25 to $35, pine $20 to $28, composite $42 to $60. Most Lenexa backyards need somewhere around 150 to 200 feet of fence, which puts a vertical cedar job in the $3,750-to-$7,000 range — a horizontal build sits a little above that for the added framing and layout the clean line demands. Anything extra — wide gates, serious drainage work on a low lot, pulling an old fence — shows up as its own line. Every quote is free, written, and itemized before we start.
Why does a horizontal fence cost more than a vertical one?
It's the labor in the line, not pricier wood. A vertical fence forgives a slightly-off post because the pickets hide it; a horizontal run shows every post that isn't dead-true, so the layout and framing take more care and time to get the boards spanning straight and tensioned. You're paying for the precision that makes the modern look actually look modern. On the same cedar, expect roughly $5 to $8 more a linear foot for horizontal over vertical.
How often does a Lenexa wood fence need re-staining?
Cedar every two years, pressure-treated pine every three, composite never. The Kansas sun and freeze-thaw swings wear a coat down faster than most homeowners expect, and on a horizontal slat run an uneven fade is more noticeable because your eye tracks the line straight across it. Miss a cycle and the color drifts gray; stay on it and the wood holds its color the length of its life. We keep records on every Lenexa fence and reach out when the recoat window opens.

OTHER LENEXA FENCE OPTIONS

Weighing Other Materials or Services for Your Lenexa Fence?

Ready when you are

Get a free estimate — we usually respond the same day.

Call (913) 286-1091