The post finally reaches a real footing
When the original installer hit the Clay County limestone and stopped digging, the post got set at 18 or 24 inches — not enough to hold on rolling ground. We come back with a rock auger and get the reset post to a true 36 inches in poured concrete where the shelf allows, keying into the rock where it does not. The post holds because it finally has the depth the ground demanded the first time.



